Connect with us and keep up to date with our latest news, projects, activities and stories.
Seaway7 has today announced the award of a sizable contract by PGE Polska Grupa Energetyczna and Ørsted for the transport and installation of the substations for the Baltica 2 wind farm, offshore Poland.
Seaway7’s scope includes the transport and installation of four substations. Offshore activity is scheduled to take place in 2026 utilising both our heavy lift and heavy transportation vessels.
Baltica 2 is a 50:50 joint venture between PGE Polska Grupa Energetyczna and Ørsted. The wind farm, with a capacity of around 1.5 GW, will be located in the Polish sector of the Baltic Sea around 40 kilometres from shore at its closest point.
Maria Eidesvik, VP for Europe and US at Seaway7 said: “This is our second contract award in the emerging Polish market and we are pleased to be taking a role in developing offshore wind in this key location. With this project we also look forward to continuing our long-standing relationship with Ørsted on our sixth offshore wind project together”.
The contract is subject to financial close of the project, expected in 2024.